Evaluating Stormwater Pump Capacity After Site Development

It’s not hard for the pump station to stop functioning to be an issue. It may still move wastewater or stormwater every day but struggle to meet the peak times, require frequent maintenance or depend on controls that are becoming difficult to maintain. It might still function however the original design of the equipment might not be a good reflection of current conditions.

Planning for infrastructure improvements is essential for municipal officials, developers and the operators of facilities.

Image credit: romtecutilities.com

See beyond the equipment Inoperable

A wastewater lift station retrofit should start with an examination of the entire system, not just the pump that is experiencing problems. Engineers need to evaluate the wet well, the mechanical equipment as well as electrical components, controls, discharge piping and the requirements for current pumping.

It is crucial to observe the state of your wet well. If the wet well’s structure is still sound, you may be able to change it out with a new equipment while keeping the existing structure. The construction costs could be lower compared to building a brand new station. Retaining existing infrastructure only makes sense if it supports the planned improvements.

The service area has changed.

A wastewater station designed in the past could be used to serve more commercial and residential buildings, homes or industrial facilities.

The changes could impact flow rates and operating demands. The successful rehabilitation of a lift facility requires more than restoring the original specifications of the equipment. Engineers should assess future and planned flows, total dynamic head capacity of the equipment, and the reliability of operation.

The solution is not always an increase in the size of the pump. New equipment has to be compatible with the existing system of piping Wet wells, wet wells and control systems, electrical supply etc. Otherwise, improving one component can lead to problems in other components.

Stormwater Retrofits have Different Priorities

A stormwater pump station retrofit introduces additional considerations because runoff can change dramatically with rainfall and surrounding development. A station that serves the detention pond could experience different patterns of inflow from those receiving water directly via storm drains. The amount of runoff that reaches the station may be affected by new pavements and parking spaces, or the alteration of drainage infrastructure.

Before recommending a major upgrade of the stormwater pump, engineers should examine the drainage areas that contribute to the project including peak flows expected in the future, storage capacity that is available, discharge conditions and the performance of the pump.

The findings will help you determine if the station needs to be renovated or if modernizing equipment is sufficient.

Design your project before you disrupt service

One frequently overlooked issue is how the existing station will function during rehabilitation. In general, wastewater systems cannot be shut down without a strategy to control flow.

In accordance with the space available and project needs Construction may require temporary bypass pumping or installing replacement infrastructure alongside the operating station.

The stormwater project also requires a careful planning due to the fact that the system could require maintenance during rain events that are unexpected. The engineering plan must contain the installation sequence along with temporary operations, equipment and integration.

The Finished System is more user-friendly

Romtec Utilities offers site-specific engineering solutions and supplies for wastewater and stormwater pumps.

Retrofitting is a method that evaluates structural, mechanical electrical, and communications elements to determine what can be left and which needs to be replaced. The company also provides initial designs and budgetary estimates to help owners analyze project options.

After installation, testing the startup Commissioning, operator training and maintenance documentation will ensure that the newly upgraded station operates in accordance with the specifications of its design. A successful rehabilitation effort will leave the operators with a system they are able to manage and comprehend.

Upgrade the System, Not Just Its Age

A pump station that is older isn’t always a good candidate to be completely replaced. Even if their electrical and mechanical equipment is old-fashioned there are some structures that can be beneficial for years to come. It is crucial to determine the elements that can be economically retained, while ensuring that the station meets current and future needs.

When examining operating conditions the structural strength, hydraulic requirements as well as construction constraints, owners can make more informed investment decisions.

It’s not just about making the old station operational. The objective is to ensure that the newly upgraded system can cope with the new demands.